Actions
One action has been reported as completed by a client and is waiting for you to confirm or reject it.
Actions
Actions
Filter actions
Export includes each action's description and notes. Describe groups, not individuals. Do not record names, flat numbers, or any person's health or mobility details.
Riverside House 1 immediate 1 of 9 done
Oakfield Care Home 4 of 6 done
| Action | Priority | Status | Due | Who owes it | Record progress or open |
|---|---|---|---|---|---|
| Replace the cracked ceiling tiles in the first-floor corridor so that the ceiling void above the escape route is closed again. A-03 · First floor · First-floor corridor ceiling | Medium | Open | 15 Oct 2026 Overdue | Oakfield Care Group | |
| Clear the stored chairs from the first-floor linen cupboard so its door closes fully. A-06 · First floor · Linen cupboard | Low | Open | 15 Dec 2026 | Oakfield Care Group |
Royal Victoria Court 2 of 4 done
| Action | Priority | Status | Due | Who owes it | Record progress or open |
|---|---|---|---|---|---|
| Replace the missing smoke seals on the two cross-corridor doors on the second floor. A-02 · Second floor · Cross-corridor doors | Medium | Open | 29 Jan 2027 | Royal Care Group | |
| Consider extending the emergency lighting to the garden path from the rear exit. A-04 · Ground floor · Rear exit path | Advisory | Open | No fixed timescale | Royal Care Group |
Not issued yet
Hillcrest Apartments 1 immediate
Not issued yet — progress is recorded once it is. Go to Check & issue
| Action | Priority | Status | Due | Who owes it | Record progress or open |
|---|---|---|---|---|---|
| Remove the stored bicycles and furniture from the ground-floor escape corridor. A-01 · Ground floor · Escape corridor | Immediate | Open | Immediately | Hillcrest Residential | |
| Replace the cracked wired-glass panel in the second-floor lobby screen with fire-resisting glazing. A-02 · Second floor · Lobby screen | High | Open | Within 1 month | Hillcrest Residential | |
| Adjust the self-closing device on the bin store door so that it latches. A-03 · Ground floor · Bin store door | Medium | Open | Within 6 months | Hillcrest Residential |
Birchfield Tower — Block A
Not issued yet — progress is recorded once it is. Go to Check & issue
| Action | Priority | Status | Due | Who owes it | Record progress or open |
|---|---|---|---|---|---|
| Fire-stop the service penetrations through the floor of the sixth-floor riser. A-01 · Sixth floor · Riser floor | High | Open | Within 1 month | Birchfield Housing | |
| Repair the automatic opening vent controller at the head of the stair. A-02 · Ninth floor · Stair head vent | Medium | Open | Within 6 months | Birchfield Housing | |
| Renew the wayfinding signs for firefighters on each floor landing. A-03 · All landings | Medium | Open | Within 6 months | Birchfield Housing | |
| Replace the missing "fire door keep shut" signs on the bin chute room doors. A-04 · Bin chute rooms | Low | Open | Within 12 months | Birchfield Housing |
19 actions across 5 assessments.