Skip to content
Three workspaces, one subscription EU hosted
Third workspace

Fire risk assessment, with the judgement left to the assessor.

A fire risk assessment is a professional judgement, not a checklist score. This workspace records that judgement section by section — against BS 9792:2025 or PAS 79-1:2020, set by the type of premises — and issues it as a report that cannot quietly change afterwards. Same subscription, sharing your clients, properties and team.

7-day trial · No card required · Cancel anytime

BS 9792:2025PAS 79-1:2020Guided captureYour risk matrixAction planLocked reportsReview datesOffline capture
Fire risk assessment report for a fictional block of flats: the action plan, with priority bands
FIG. 01  Fire risk assessment — action plan, page 26 of 31
15 sections From premises and scope to the declaration, with questions shown only where the facts of the building make them relevant. Guided capture
Your rating The matrix shows what a likelihood and a consequence produce. The assessor enters the final rating, and a different one needs a reason. Never calculated
4 bands Every shortcoming takes an action banded Immediate, High, Medium or Low, with the timescale each band stands for printed in the report. Prioritised
Locked An issued report is rendered from a frozen snapshot and never regenerated. A change is a new version that supersedes it. Versioned
01What it does

In this area, Fire Door App can:

  • Record each premises once — type, height, storeys, dwellings, construction and evacuation strategy — and link it to a property you already hold
  • Apply BS 9792:2025 to housing and PAS 79-1:2020 to non-domestic premises, set by the premises type rather than picked by hand
  • Choose BS 9792:2025 assessment types 1 to 4 — common parts or dwellings, non-intrusive or intrusive — with the scope of each type written out
  • Assess premises in England and Wales, with the England-only duties hidden for a building in Wales
  • Work through fifteen sections, from premises, scope and limitations to the assessor’s declaration, saving as you go
  • Record every judgement as satisfactory, improvement required, not satisfactory, not applicable, not inspected or outside your competence
  • Keep your own 3×3 or 5×5 risk matrix, with your own axis labels and definitions, retired rather than edited when your method changes
  • Enter the final risk rating yourself, and record why wherever it differs from the matrix
  • Raise an action for every shortcoming, banded Immediate, High, Medium or Low
  • Refuse to issue while a shortcoming has no action, no priority band or no photograph
  • Issue a locked report PDF, and revise it as a new version that supersedes the last
  • Set the review date yourself, with separate annual review dates for the two duties that carry one in specified residential buildings in England
  • Carry forward, complete or close every outstanding action from the previous assessment before a review can be issued
  • Capture answers and photographs without signal, syncing when you reconnect
  • Give clients portal access to their issued assessments and the same PDF you hold
  • Turn an action into a quote in the document builder

The module records the assessor’s judgement. It does not calculate a risk rating and it does not certify premises — the report says so on its face.

02How it runs

The way this actually works on a job.

  1. 01

    Describe the building once

    Premises type, country, height, storeys, construction and evacuation strategy, with the responsible persons who hold the duty. The type sets the standard and the country sets the law, so neither has a default: guessing England would apply English duties to a Welsh building.

    Premises recordResponsible personsLinked property
  2. 02

    Capture section by section

    Fifteen sections, each saved as you go, with questions shown or hidden by the facts of the building. A question that does not apply says so rather than being left blank — blank reads as unassessed. Answers and photographs queue on the device when there is no signal.

    Guided capturePhotographsOffline
  3. 03

    Evaluate, then plan the work

    Rate the risk against your own matrix, frozen for this assessment. Every shortcoming takes an action and a priority band, and a finding outside your competence takes one too — somebody still has to obtain the specialist view.

    Risk matrixFinal ratingAction plan
  4. 04

    Issue it, and it stays issued

    The readiness panel lists what stands between the assessment and issue. Once issued, the report is locked and rendered from a frozen snapshot. A draft report carries DRAFT on its cover; a change after issue is a revision, never an edit.

    Readiness panelLocked PDFVersions
  5. 05

    Review it, and hand it over

    The assessor sets the review date. The dashboard lists reviews that have fallen due, a review carries forward what the last assessment left open, and the client reads the issued assessment and downloads the PDF in their portal.

    Review datesCarry-forwardClient portal
03What’s in it

The parts you will use every week.

The standard follows the building

BS 9792:2025 for housing, PAS 79-1:2020 for non-domestic premises, both for mixed use — read from the premises type, so an assessment cannot be written to the wrong one.

A matrix you own

3×3 or 5×5, with your own axis labels and definitions. Issued assessments keep the matrix they were issued against when you retire it for a new one.

An issue gate that means something

Every visible judgement answered, every shortcoming with an action, a priority band and a photograph. The assessor cannot sign a document that leaves questions unanswered.

Versions, not edits

There is no un-issue. A revision supersedes the report before it, and the earlier version stays on the record as it was.

Three review clocks, kept apart

The assessment’s own review date, set by the assessor with no default period, and the two annual statutory reviews that apply only to specified residential buildings in England.

One building, three workspaces

Link a premises to a property and its fire doors, fire stopping and fire risk assessment sit side by side, with the client’s assessments and actions in their Client Hub.

04The output

What comes out of it

A report that states its scope, its limitations and its statutory position before it states a finding.

Fire risk assessment report
PDF — cover, contents, scope and limitations, the statutory position, the fifteen sections with their photographs, the risk evaluation and the action plan. The published sample runs 31 pages for a block of 42 flats
Action plan
Every action with its priority band, and the timescale each band stands for printed alongside
Draft report
The same document with DRAFT on the cover, for checking before it is issued
Client portal copy
Issued assessments only — scope, limitations, review dates, the action plan and the same PDF
Your wording
Report wording editable in Settings, with the statutory statements fixed
Price
Included on the Seat plan. £7 per assessment on the Usage plan, charged once when its first report is produced
05 Quick questions

Questions this area gets asked.

Q01

Does the software work out the risk rating?

No. The matrix shows which rating a likelihood and a consequence produce, but the assessor enters the final rating, and where it differs from the matrix the assessor records why. The report prints both ratings side by side.
Q02

Which standard does an assessment follow?

The premises type decides. Housing — blocks of flats, maisonettes, HMOs, student and specialised housing — is assessed against BS 9792:2025, with types 1 to 4. Non-domestic premises, including care homes and short-term lets, are assessed against PAS 79-1:2020. Mixed use takes both.
Q03

Can we assess buildings in Scotland or Northern Ireland?

Not yet. The Fire Safety Order does not extend there, so a premises in Scotland or Northern Ireland can be recorded but the software refuses to create an assessment for it. England and Wales are assessed, with the England-only duties hidden for a Welsh building.
Q04

What does it cost?

On the Seat plan it is included, with no usage metered on top. On the Usage plan it is £7 per assessment, charged once when that assessment’s first report is produced — re-downloading it costs nothing. A review is a new assessment and is charged as one. A revision that corrects an issued assessment is free if it is started within 30 days of that assessment being issued; after that it is charged as a new assessment. See pricing →
Q05

Can a report be changed after it is issued?

Not in place. Issuing locks it. A change is a revision: a new version that supersedes the issued one, which stays on the record exactly as it was.
Q06

Who can author an assessment?

A user an owner or manager has marked as a fire risk assessor. It is a capability rather than a role. Assessors keep their own profile — qualifications, registration body and number, CPD and professional indemnity — which is self-declared: nothing in it is verified or badged by us.
Q07

Does capture work without signal?

Answers and photographs queue on the device and sync when you reconnect. Creating the premises and issuing the report need a connection.
More detail in the full FAQ Browse full FAQ
Start today

Assess one building. Then read the report it issues.

Set up a premises, work through the sections and produce the draft report. The trial includes the fire risk assessment workspace, with nothing held back.

No card. Cancel anytime.