Fire stopping · Analytics
Workspace analytics
Surveys, penetration outcomes, tested-system certification and at-risk properties — fire-stopping only.
Surveys completed
4
In last 90 days
Penetration pass rate
87%
124 pass / 4 defects
Open defects
4
1 high severity
Overdue surveys
1
Past visit date
Analytics
| Activity | Actor | When |
|---|---|---|
|
Penetration
P-014 flagged — copper pipe, annular gap oversized
|
James Patterson | 11 Jun 2026 · 11:42 |
|
Penetration
P-039 sealed — intumescent batt verified
|
James Patterson | 11 Jun 2026 · 10:18 |
|
Survey
SRV-014 capture resumed — Riser 2 · Level 3
|
James Patterson | 11 Jun 2026 · 08:55 |
|
Survey
SRV-009 re-inspection booked — Meadow Court · Block A
|
Priya Kapoor | 9 Jun 2026 · 15:04 |
|
Survey
SRV-013 completed — Hartwell House basement plant room
|
James Patterson | 28 May 2026 · 16:20 |
Not populated in the live demo — capture penetrations in the full workspace to see outcome, type, and element breakdowns here.
Not populated in the live demo — the full workspace tracks certificate validity and usage for every tested system you specify.
Not populated in the live demo — the full workspace ranks clients and properties by open defects and overdue surveys.
Not populated in the live demo — the full workspace keeps a paginated, exportable trail of every survey and penetration event.