Track outstanding actions, schedules and sign-off door by door — so remedials stay connected to the original inspection evidence instead of drifting into separate trackers.
Project boardsSchedulingSign-offCompletion proof
Remedials board · Block A
Outstanding
D-04
Plant room — self-closer
In progress
D-02
Lobby — strip replace
Complete
D-06
Bin store — signed off
7
outstanding
3
in progress
11
complete
Project boards
See what's outstanding, booked and complete.
Project boards replace ad hoc remedials trackers. Every action stays visible at door level — without drifting into a separate spreadsheet world.
✓Outstanding, in-progress, complete view
✓Per-door action tracking
✓Across buildings and programmes
✓Linked to originating inspection
Schedule · Building 3
Planned actions
Mar 2026
D-07
Intumescent strip replacement← Mar 2026 inspection
Open
D-12
Self-closer adjustment← Sep 2025 inspection
Booked
D-03
Frame gap remediation← Mar 2025 inspection
Done
Scheduling
Plan visits around what's actually outstanding.
Scheduling views help teams prioritise and book work based on what inspection evidence has flagged — not a separate list that quickly goes stale.
✓Actions linked to originating findings
✓Schedule across sites and programmes
✓Open / booked / complete status
✓Visible to office and site teams
Scroll
Block A · Completion record
Sign-off status
Audit ready
✓
D-06 Bin store — signed off
14 Mar
✓
D-03 Corridor — strip replaced
12 Mar
○
D-07 Lobby — awaiting sign-off
Pending
○
D-04 Plant room — booked
18 Mar
📎 Before/after photos attached · linked to door D-06 record
Sign-off & completion
Completion proof stays attached to the right door.
Before-and-after evidence and sign-off remain linked to the original door record and finding — not filed separately where the connection gets lost.
✓Before/after photo evidence
✓Sign-off tied to originating finding
✓Timestamped completion record
✓Audit-friendly trail from start to close
Fire Door App
Run one building. See the remedials trail.
7-day trial. Inspect a building, raise remedials and track them through to sign-off — then see how the completion evidence looks. No card, no commitment.