Open tasks
2
This is the read-only portal your clients log into — compliance overview, remedials, quotes, invoices and documents, all shared automatically from your workspace.
~5 minutes · 9 pages · You can quit any time
Before you go…
7-day free trial, no credit card, no setup fee. Every client you add gets their own read-only portal automatically — inspections, remedials, quotes and invoices included.
No card required · Cancel anytime
| Door | Issue | Severity | Status | Scheduled | Completed |
|---|---|---|---|---|---|
|
Reception — main entrance lobby
Tag: FD-02
|
Glazing bead (vision panel)
Vision panel glazing bead split along full length; retaining fixings loose. Replace bead and re-fix.
|
High | Scheduled | 22 Apr 2026 | — |
|
Storage — basement B2
Tag: FD-15
|
Hinge fixings (middle hinge)
Two hinge screws under-torqued; re-tighten to spec during the next visit.
|
Low | Scheduled | 22 Apr 2026 | — |
|
Corridor — 4th floor east
Tag: FD-08
|
Intumescent seal (head)
Seal detachment at mitred corner. Replaced full head seal; witnessed closure clearance 3 mm.
|
Medium | Completed | 28 Feb 2026 | 28 Mar 2026 |
|
Corridor — 4th floor west
Tag: FD-09
|
Intumescent seal (hinge side)
Seal cut short by 45 mm at installation. Full-length replacement fitted; inspector sign-off complete.
|
Medium | Completed | 28 Feb 2026 | 28 Mar 2026 |
|
Gym changing rooms — ground
Tag: FD-10
|
Overhead door closer
Closer failed to return from 75°. Replaced with TS.5222 + witnessed three close cycles from 90°.
|
Medium | Completed | 28 Feb 2026 | 20 Mar 2026 |
|
Kitchen — back-of-house
Tag: FD-11
|
Threshold seal
Threshold seal worn by trolley traffic. Drop-seal retrofit installed; gap now 0 mm closed.
|
Low | Completed | 28 Feb 2026 | 20 Mar 2026 |