Client portal Remedial project
Pine Court

Pine Court — September 2026 follow-ups

12 Pine Street, London, E14 9AB · In progress
Four remedial items from the September inspection — two high-severity seal replacements and two closer adjustments.
Open tasks
4
Awaiting remedial work
High severity
2
Needing attention
Completed
0
Tasks resolved
Next visit
22 Oct 2026
Remedial visit
Last activity
30 Sep 2026
Most recent change
Door Issue Severity Status Scheduled Completed
Corridor — 3rd floor fire door
Tag: FD-03
Intumescent seal (head)
Seal detached along top edge — no longer continuous. Replace full length.
High Scheduled 22 Oct 2026 —
Stairwell A — entry from 2nd floor
Tag: FD-12
Intumescent seal (hinge side)
Seal shrinkage > 20 mm; adjacent hinge leaf compromised. Replace both vertical seals.
High Scheduled 22 Oct 2026 —
Plant room — 1st floor
Tag: FD-04
Overhead door closer
Closing speed too slow; door fails to latch from 30°. Adjust closing valve + spring power.
Medium Scheduled 22 Oct 2026 —
Refuse store — ground floor
Tag: FD-18
Overhead door closer
Hydraulic leak from closer body; replacement ordered, fitment scheduled with seal job.
Medium In progress 22 Oct 2026 —
Your information, securely in one place. Provided by FireSafe Pros