Inspection · 01 Sep 2026
Door register
| Door | Location | Status | Issues |
|---|---|---|---|
| Corridor A Level 1 | Level 1 | PASS |
None0
0
|
| Stair core Level 1 | Level 1 | PASS |
None0
0
|
| Unit 203 Level 2 Intumescent strip damaged along top edge. | Level 2 | FAIL |
1 fail
0
Failing components
Intumescent seal (head) · High
|
| Unit 207 Level 2 Closer arm out of adjustment. | Level 2 | FAIL |
1 fail
0
Failing components
Overhead door closer · Medium
|
| Unit 304 Level 3 | Level 3 | PASS |
None0
0
|
Floorplans
Level 1
4 pinned doors on this plan.
Level 2
1 pinned door on this plan.
Timeline
-
On-site inspection started by Tom Rivers.
-
Door FD-03 failed inspection — intumescent strip damaged.
-
Door FD-04 failed inspection — closer out of adjustment.
-
Inspection completed and report submitted to your portal.
-
Remedial project "Pine Court — September 2026 follow-ups" scheduled for 22 October.